Links
 

rainbird.com
toro.com
virtualrain.com




Irrigation / Underground Drainage

Click here to view presentation - must have pop blocker turned off

Irrigation Design / Installation

Irrigation Service

  • Spring Activation (April/May):
    1. Activate System: turn water on, check plumbing and vacuum breaker.
    2. Set System: Activate controller, set schedule & test system. Adjust system as needed for proper coverage.
    3. Inspect heads, nozzles, rain sensor & lines: clean as necessary.
    4. Repair any damaged equipment: labor and materials will be billed as an additional item separate from the service contract
  • Summer Check (July/August): Optional Non-Contract Service
    1. Correct and adjust sprinklers as needed.
    2. Adjust controlling settings to seasonal watering needs.
    3. Repair any damaged equipment: labor and materials will be billed as an additional item separate from the service contract.
  • Fall Winterization (October):
    1. De-activate System: turn water off to sprinkling system and drain inside pipes and vacuum breaker. Turn off controller.
    2. Remove water from lines using compressed air and/or open all manual drains and faucets.

Underground Drainage Systems